Figure 2From: Conditions for prosperity and depression of a stochastic R&D model under regime switchingThe time-series plots of \(x(t)\) and \(y(t)\) for model (4) with initial value \((x_{0}, y_{0})=(0.9, 0.6)\), and other parameters are taken as in Table 2Back to article page